Calculation Methodology for Kindastuff Solar Analytics

This page documents the formulas, variable definitions, input validation rules, assumptions, and industry standards behind every calculator on Kindastuff. It exists so that any engineer, asset manager, reviewer, or peer can see exactly how a result is produced — and judge its limits — before relying on it.

The website's source code is not open-source. This page documents the calculation logic, not the implementation. Publishing a formula does not mean the tool has been independently validated, audited, or certified. Where a result depends on your inputs or on data quality, that dependency is stated.

Not bankable. Not IEC-certified. Kindastuff calculators are free, browser-based screening and analysis tools. They are not a substitute for a calibrated measurement campaign, independent engineering review, or energy-yield simulation software (PVsyst, SAM, PlantPredict) for financial or contractual use. Plant-specific contracts, PPA definitions, and reporting conventions take precedence over anything on this page.

Maintained by Aman Yadav

This methodology is written and maintained by Aman Yadav, a solar plant performance engineer with hands-on experience in utility-scale plant operations, performance monitoring, and data analytics. The calculators reflect real O&M workflows — including the DC-vs-AC capacity conventions, sensor quality caveats, and validation limits that matter in practice.

How to read this methodology

Every metric on this page falls into one of three categories. Knowing which is which tells you how much weight to give a result:

CategoryMeaningExamples
Standard-definedThe formula follows an established standard or clause directly.Specific Yield (IEC 61724-1 §7.3), Reference Yield (§7.1), Capacity-Based PR (§7.5), Inverter efficiency principle (IEC 61683)
Standard-informed / site-adaptedBuilt on a standard's framework, with a documented extension or rearrangement.CUF with AC-capacity convention, Efficiency-Based PR (algebraic rearrangement of PR)
Kindastuff-definedA custom operational metric. Not defined in IEC 61724-1.Performance Target Index (PTI), PR_expected, Module PR

Citing a standard does not mean a calculator is IEC-certified or that its output guarantees compliance. It means the mathematical basis is traceable. Conversely, a Kindastuff-defined metric is not invalid — it is simply internal, and must never be used for contractual reporting.

Calculator methodology index

Seventeen metrics across fifteen calculators. Fourteen are fully documented below; three are marked documentation in progress and are not yet published as methods.

CalculatorStandard basisMethodStatus
CUF / PLFIEC 61724-1 (adapted)ViewDocumented
Degradation & Insolation Corrected CUFIEC 61724-1 / IEC 61215-1ViewDocumented
Specific YieldIEC 61724-1 §7.3ViewDocumented
Reference YieldIEC 61724-1 §7.1ViewDocumented
Performance Target Index (PTI)Kindastuff-definedViewDocumented
Capacity-Based PRIEC 61724-1 §7.5ViewDocumented
Efficiency-Based PRIEC 61724-1 (rearranged)ViewDocumented
Instantaneous PRIEC 61724-1 §7.5ViewDocumented
Temperature-Corrected PRIEC 61724-1 Annex BViewDocumented
Soiling AnalysisIEC 61724-1 / Micheli 2021ViewDocumented
Inverter Efficiency DashboardIEC 61683 principleViewDocumented
Solar Panel EfficiencyIEC 61215-1 / IEC 61730ViewDocumented
String Current DeviationIEC 62446-1 / Iglewicz & Hoaglin 1993ViewDocumented
Plant & Grid Generation Loss——In progress
Plant & Grid Availability——In progress
NMGG Calculator——In progress
Solar Insolation — POA Back-CalculatorIEC 61724-1 §7.5 (rearranged)ViewDocumented

Calculation methods

Capacity Utilization Factor (CUF / PLF)

Purpose. Generation as a percentage of the theoretical maximum if the plant ran at rated capacity for every hour of the period.

Formula.

CUF (%) = [ E_AC / (P_ref × T) ] × 100

T = Days × 24   (hours in the analysis period)

Inputs / output. E_AC (kWh), P_ref (kWp or kW), period length (days) → CUF (%).

Reference. IEC 61724-1:2021 §3 (Terms and Definitions) and §7 (Performance Indices), Final Yield §7.3. Advisory basis; extended below.

Convention and caveats. IEC 61724-1 defines P_o as DC capacity, but many PPAs (SECI standard documents, CERC regulations) define CUF against contracted AC capacity. This calculator accepts both — label your report accordingly; the same plant produces different CUF values under each convention. CUF is a summary metric: a low value does not identify the cause, and it conflates irradiance variability with plant-side losses. Review alongside PR, irradiance, and availability. Solar CUF (typically ~15–25%) is not comparable to thermal PLF (70–90%) because operating hours differ fundamentally.

Degradation & Insolation Corrected CUF

Purpose. CUF normalised for module aging and for irradiance that deviates from design-year assumptions — for fair comparison of actual output against a degraded plant's expected output under actual irradiance.

Formula.

Step 1  P_DC_corrected = P_DC_nameplate × (1 − Da/100)^n

Step 2  SF = H_POA_actual / H_POA_design

Step 3  CUF_corrected (%) = [ E_AC / (P_DC_corrected × SF × T) ] × 100

Inputs / output. E_AC, P_DC_nameplate, uniform annual degradation rate (Da), years since commissioning (n), actual and design-year POA insolation → corrected CUF (%).

Reference. IEC 61724-1:2021 §4 and §7; degradation rates per IEC 61215-1:2021 long-term characterisation and Jordan & Kurtz (2013).

Convention and caveats. This corrected variant uses DC capacity only (kWp) — the conventional CUF tool accepts DC or AC to suit PPA conventions. Typical crystalline-silicon degradation is 0.4–0.7%/yr, applied uniformly here. Accumulated degradation reaches roughly 2–3.5% after five years, so comparing current CUF to the original design target without correction shows apparent underperformance that is simply expected aging.

Specific Yield (Final Yield)

Purpose. Net AC energy per unit of installed DC capacity — normalises generation by plant size.

Formula.

Y_f      = E_AC / P_DC                (kWh/kWp)

Y_f_daily = E_AC / (P_DC × N)          (kWh/kWp/day)   N = days in period

Inputs / output. E_AC (kWh), P_DC (kWp), N (days) → yield (kWh/kWp; or per day).

Reference. IEC 61724-1:2021 §7.3. Standard-defined (system performance index, not a loss parameter).

Convention and caveats. Reflects both resource and system losses — it does not isolate plant-side efficiency from irradiance. When comparing two plants, confirm irradiance conditions are equivalent before concluding a performance difference. Typical Indian ground-mount fixed-tilt range: ~3.2–5.0 kWh/kWp/day, indicative only.

Reference Yield

Purpose. In-plane energy available to the array, expressed as equivalent peak sun hours.

Formula.

Y_r       = H_POA / G_STC              (hours)
Y_r_daily = (H_POA / G_STC) / N        (hours/day)

G_STC = 1 kW/m²  (fixed constant)

Inputs / output. H_POA (kWh/m²), N (days) → reference yield (peak sun hours).

Reference. IEC 61724-1:2021 §7.1. Standard-defined (resource parameter).

Convention and caveats. This characterises what the sun provided, not plant performance. It is the denominator of Performance Ratio. POA must be measured at the array's actual tilt/azimuth — substituting GHI introduces a seasonal systematic error (see §5 Instrumentation).

Performance Target Index (PTI)

Purpose. Compares actual daily Specific Yield against the expected yield implied by irradiance and an anticipated PR.

Kindastuff-defined metric — not in IEC 61724-1. For contractual or formal evaluation, use IEC 61724-1 PR (Y_f / Y_r) directly.

Formula.

PTI = Y_f_daily / (Y_r_daily × PR_expected)

PR_expected entered as a percentage (e.g. 55.78) and converted internally.

Inputs / output. Y_f_daily (kWh/kWp/day), Y_r_daily (h/day), PR_expected (%) → PTI (dimensionless).

Interpretation. <0.80 underperformance; 0.80–1.20 normal; >1.20 overperformance or unrealistic inputs (verify the PR assumption).

Caveats. The result is entirely dependent on the accuracy of PR_expected — an optimistic assumption will flag underperformance on a healthy plant. Internal diagnostic flag only; never for PPA compliance.

Capacity-Based Performance Ratio (PR)

Purpose. The standard, most widely used plant performance index — actual output versus the reference yield from measured POA irradiance, normalised to DC capacity.

Formula.

PR = Y_f / Y_r

PR (%) = [ E_AC / (P_DC × H_POA / G_STC) ] × 100

G_STC = 1 kW/m² (fixed, non-adjustable)

Inputs / output. Energy generated (kWh), plant DC capacity (kWp), POA insolation (kWh/m²) → PR (%).

Reference. IEC 61724-1:2021 §7.5. Standard-defined.

Output flags. PR >96% → “Suspiciously high — verify data quality.” PR >100% → “Statistical error — physically impossible.”

Worked example. 450 kWh ÷ 100 kWp ÷ (5.5 kWh/m² ÷ 1 kW/m²) → (4.5 / 5.5) × 100 = 81.8%.

Caveats. Does not correct for temperature (use Temperature-Corrected PR for that). Highly sensitive to POA sensor accuracy. In DC-oversized plants, clipping suppresses PR even when the plant is working as designed. Best for trend analysis within one plant; cross-plant comparison requires identical capacity conventions, sensor placement, and time-alignment.

Efficiency-Based Performance Ratio (PR)

Purpose. PR computed from module active area and rated efficiency instead of nameplate DC capacity — an independent check on the capacity-based figure.

Formula.

P_eff   = A_total × η_module × G_STC

PR (%)  = [ E_AC / (P_eff × H_POA / G_STC) ] × 100

which expands to:
PR (%)  = [ E_AC / (A_total × η_module × H_POA) ] × 100

Inputs / output. Energy generated (kWh), POA insolation (kWh/m²), total active module area (m²), rated module efficiency (%, validated 10–40) → PR (%).

Reference. IEC 61724-1:2021 §7.5 (algebraic rearrangement). Standard-informed.

Caveats. Total active area must represent generating surface only — including frame borders or spacing inflates it and suppresses PR. Useful where nameplate capacity is uncertain but module area and efficiency are known.

Instantaneous Performance Ratio (PR)

Purpose. Real-time PR from SCADA power and irradiance readings — for dashboards and fault detection.

Formula.

PR_instantaneous (%) = (P_AC / P_DC) × (G_STC / G_POA) × 100

G_STC = 1000 W/m² (fixed, non-adjustable)

Inputs / output. AC power (kW), plant DC capacity (kWp), POA irradiance (W/m², hard-blocked outside 200–1361) → PR (%).

Reference. IEC 61724-1:2021 §7.5 (power form). Standard-defined.

Validation. Irradiance <200 W/m² is blocked (inverter efficiency is non-linear and SNR degrades). >1361 W/m² is blocked (above the solar constant). AC power > DC capacity is blocked. PR >95% flags suspicious; >100% flags error.

Caveats. Highly volatile — never use as a plant KPI; cloud transients, ramp delays, and sensor noise cause large, meaningless swings. Time-alignment of power and irradiance is critical (a 1-minute offset misleads during changing irradiance). DC-oversized plants clip at high irradiance, suppressing PR.

Temperature-Corrected Performance Ratio (PR)

Purpose. PR normalised to 25°C module temperature — answers “what would PR have been at STC temperature?”, enabling fair seasonal comparison.

Formula.

Step 1  PR_raw = E_AC / (P_DC × H_POA / G_STC)

Step 2  temperatureCorrection = 1 + (γ / 100) × (T_module − T_STC)

Step 3  PR_tc = PR_raw / temperatureCorrection

γ = module power temp. coefficient (%/°C, negative)
T_STC = 25°C (fixed)

Inputs / output. Energy generated, DC capacity, avg module temperature (°C, validated −40 to 85), POA insolation, and γ (validated −0.65 to −0.15 %/°C) → corrected PR (%).

Reference. IEC 61724-1:2021 Annex B. Standard-defined method.

Directional behaviour. Above 25°C the correction denominator is <1, so PR_tc > PR_raw — it restores the thermal portion of apparent loss. Below 25°C it removes the cold-weather boost. If the denominator reaches ≤0, the calculation is blocked.

Output flags (applied to PR_tc). PR_tc ≥96% → “Suspicious PR — verify input data quality.” PR_tc >100% → “Statistical error — physically impossible; check inputs.”

Caveats. Uses average module temperature; because irradiance and temperature are correlated, precise work should correct interval-by-interval (15-min/hourly) before aggregating. The linear γ model is standard practice but approximate. Using the wrong module's γ biases the result. This removes the aggregate thermal effect only — it does not isolate inverter thermal derating or inter-row gradients. Always source γ from the installed module's datasheet.

Soiling Analysis

Purpose. Quantifies the efficiency penalty from soiling using paired pre-clean / post-clean power and irradiance readings.

Formula.

Per-sample efficiency:
η_sample (%) = (P × 1000) / (G × A) × 100

Soiling ratio (literature form):
SR = P_soiled / P_clean

Overall efficiency (arithmetic mean):
Overall (%) = Σ η_sample / n

Derived soiling loss (percentage points):
Loss (pp) = Post-Clean Efficiency − Pre-Clean Efficiency

Derived relative soiling loss:
Relative loss (%) = (Post-Clean − Pre-Clean) / Post-Clean × 100

The calculator reports the pre-clean and post-clean efficiency figures; the loss values above are derived from them. Percentage points and relative percentages are not interchangeable — state which one you are quoting.

Inputs / output. Plant active area (m²), rated module efficiency (%), and up to 20 pre-/post-clean power–irradiance pairs → pre-clean and post-clean efficiency (%), per-sample bar chart. Power readings <0.3 kW are rejected.

Reference. IEC 61724-1:2021 (soiling as a loss category) and Micheli et al. (2021), DOI 10.1002/pip.3441.

Caveats. Measures soiling only at the cleaning event — it is not a continuous soiling rate. Irradiance normalisation mitigates, but does not eliminate, temperature differences between readings. Sample efficiencies are cross-validated against rated module efficiency to catch impossible results. For reliable data, take pre/post readings close in time, above ~400 W/m², avoiding cloud transients, with the same instrument and connection points.

Solar Inverter Efficiency Dashboard

Purpose. DC-to-AC conversion efficiency per inverter from time-stamped field data, with statistics, charts, and a record explorer. Isolates the inverter stage only.

Formula.

η (%) = (P_AC / P_DC) × 100

Energy (trapezoidal integration):
Eᵢ = ((Pᵢ + Pᵢ₊₁) / 2) × Δt

Inputs / output. CSV/Excel with Timestamp, Inverter, DC Power, AC Power (≤5 MB, ≤1,000 rows, ≤5 inverters) → per-inverter mean/median/std-dev/min/max η, integrated DC/AC energy, plant summary, diagnostic charts.

Reference. IEC 61683:1999 (efficiency measurement principle; the basis for Euro-eta / CEC-weighted figures). Field efficiency is complementary to — not the same as — datasheet weighted efficiency.

Caveats. DC and AC columns must share the same unit (no auto-conversion; a unit mismatch is the most common cause of impossible results). Energy accuracy depends on evenly spaced timestamps — logger gaps silently understate energy (treat as a lower bound). A high standard deviation signals inconsistent conversion (intermittent string faults, loose DC connections, thermal derating cycling), not uniform degradation. Below 80% at rated load suggests a fault; below 50% is almost always a data problem; low efficiency in the morning/evening is normal.

Solar Panel Efficiency Calculator

Purpose. Module-level STC, operating, and temperature-corrected efficiency, expected output, and a Module PR health index — for single modules, up to 10 in comparison, or a SCADA CSV batch.

Formulas.

A       = Length × Width                                  (module area, m²)
η_STC   = [ P_rated / (A × G_STC) ] × 100                 (%, G_STC = 1000 W/m²)

Cell temperature — NOCT model:
  T_cell = T_amb + G_total × ((NOCT − 20) / 800)

Cell temperature — Faiman model:
  T_cell = T_amb + G_total / (U0 + U1 × WS)               U0=29.0, U1=6.9

Cell temperature — back-of-module RTD:
  T_cell = T_mod + (G_total / 1000) × ΔT_cond             ΔT_cond=3°C default

Effective irradiance (bifacial):
  G_total = G_front × (1 + BG/100)
  G_total = G_front + (G_rear × φ)                        φ default 0.70

Operating efficiency:
  η_op = [ P_measured / (A × G_total) ] × 100

Temperature-corrected efficiency:
  η_tc = η_op / [ 1 + (γ/100) × (T_cell − 25) ]

Thermal loss:
  Thermal Loss (%) = −γ × (T_cell − 25)

Expected output:
  P_expected = P_rated × (G_total/1000) × [ 1 + (γ/100) × (T_cell − 25) ]

Module PR:
  Module PR (%) = (P_measured / P_expected) × 100

Inputs / output. Module dimensions/area, rated power, NOCT, γ, irradiance, ambient/module temperature, wind speed, measured DC power, optional bifacial parameters → η_STC, η_op, η_tc, thermal loss, P_expected, Module PR.

Reference. IEC 61215-1:2021 (STC, NOCT procedure) and IEC 61730 (operating limits). Faiman (2008) cell-temperature model; defaults consistent with pvlib open-rack glass-polymer values.

Validation highlights. STC efficiency >40% is hard-blocked (almost always millimetres entered instead of metres) and <10% is warned. Measured power >1.5× nameplate is blocked (cloud-edge spikes only justify ~1.15×, which is a warning). Operating efficiency >1.3× the module's own η_STC is blocked. γ magnitude must be 0 < |γ| ≤ 0.60 %/°C; magnitudes below 0.10 or above 0.45 warn. Wind speed <0 or >50 m/s is blocked (>20 m/s warns). Module temperature outside −40–100 °C warns and the row is retained; irradiance >1500 W/m² warns. Irradiance <50 W/m² is excluded (night filtering); SCADA rows with negative irradiance/power are set to 0 with a warning.

Caveats. Module-level, not plant-level — Module PR is not IEC 61724-1 plant PR. Not a substitute for IEC 61215/61730 certification testing or for yield-simulation software.

Solar String Current Deviation Calculator

Purpose. Peer-group screening of DC string currents within the same combiner box / MPPT channel, flagging strings that warrant field inspection. A screening tool, not a diagnostic instrument.

Formulas.

Group reference (choose one):
  I_ref = median(I_active)          (Active Median, default)
  I_ref = mean(I_active)            (Active Mean)
  I_active = strings with current > 0.05 A

Spread:
  σ  = √[ Σ(Iᵢ − Ī)² / (n_active − 1) ]     (Bessel correction)
  CV = (σ / Ī) × 100

Method A — fixed percentage band (default ±5%):
  ΔI (%) = ((Iᵢ − I_ref) / I_ref) × 100

Method B — Modified Z-Score via MAD:
  MAD = median(|Iᵢ − activeMedian|)
  M   = 0.6745 × (Iᵢ − activeMedian) / MAD

  MAD fallback (when MAD collapses to 0):
  MAD_fallback = 0.8453 × MeanAbsoluteDeviation

Energy loss estimate:
  δᵢ = max(0, (I_ref − Iᵢ)/I_ref)      (0-current strings → δ = 1.0)
  E_healthy = P_string_STC × PSH × PR  (PR fixed 0.80)
  E_daily_loss = Σ δᵢ × E_healthy
  E_annual_loss = E_daily_loss × 365
  Revenue_loss = E_annual_loss × tariff

Inputs / output. Group ID, String ID, current (required); voltage, timestamp (optional). Manual entry or CSV/TSV. Outputs reference current, CV, confidence rating, per-string deviation and Modified Z-Score, status badges, recommended field action, energy/revenue impact, and CSV/JSON export.

Reference. IEC 62446-1 (string current verification); robust statistics per Iglewicz & Hoaglin (1993). Kindastuff screening thresholds.

Validation / thresholds. Current >45 A hard-blocked; >25 A warned (Y-harness/bifacial?). ≤0.05 A treated as inactive (“check fuse”), excluded from the baseline; negatives flagged as polarity issues. Duplicate String IDs in a group are rejected. Default ±5% band (watch begins at ±3%); MAD method default threshold 3.5 (watch at |M|=2.1).

Caveats. Comparisons are valid only between strings of the same module model, series count, tilt/azimuth, and tracker position. Readings at low irradiance (<~200 W/m²), during cloud transients, or with tracker movement are unreliable. Equal current does not prove equal energy (voltage and temperature matter). Uses a fixed PR of 0.80 for loss estimation. The PSH normalisation deliberately avoids overstating losses (noon-deficit × 10 h would overstate by 40–70%) — it remains an operational estimate, not a PVsyst-equivalent simulation. Confirming any fault requires physical testing (clamp meter, Voc, I-V trace, thermal imaging, insulation resistance).

Solar Insolation — POA Back-Calculator

Purpose. Back-calculates plane-of-array (POA) insolation from measured plant energy output, using two independent back-calculations that are cross-validated against each other. Intended for cases where a direct POA sensor reading is unavailable or suspect.

This is an estimation tool, not a measurement. The result is derived from energy output and inherits every assumption embedded in the PR and module efficiency inputs. It is directional, not auditable, and is not a substitute for calibrated pyranometer or reference-cell data.

Standard reference. Both methods are algebraic rearrangements of IEC 61724-1:2021 relationships — the capacity method inverts the Performance Ratio definition (§7.5); the area method inverts the efficiency-normalised PR form (§7.5). No new formulas are introduced.

Formulas.

G_STC = 1 kW/m²   (= 1000 W/m², fixed physical constant)

Method 1 — Capacity basis:
    H_POA_capacity = (E_AC / P_DC) × (G_STC / PR)

Method 2 — Area basis:
    H_POA_area     = E_AC / (A_total × η_module × PR)

Cross-validation:
    difference (%) = |H_POA_area − H_POA_capacity| / H_POA_area × 100

Accepted result (difference ≤ 25%):
    H_POA = (H_POA_capacity + H_POA_area) / 2

Inputs.

InputDescriptionUnitValidation
Energy GeneratedNet AC energy output during the periodkWh≥ 0.01
Plant DC CapacityTotal nameplate DC capacity of installed PV modules at STCkWp≥ 1
Plant AreaTotal active module surface area (excludes land, walkways, spacing)m²≥ 1
Irradiance @ STCStandard test condition irradiance referencekW/m²Fixed at 1 — not user-adjustable
Module EfficiencyRated module conversion efficiency from datasheet%10–40
Average PRPlant Performance Ratio for the reporting period%10–95

Both PR and η_module are entered as percentages and converted to decimals internally. G_STC is fixed at 1 kW/m², consistent with IEC 61724-1 and every other PR calculator on this site.

Method. The two methods reach the same quantity from different inputs. Method 1 uses P_DC, a nameplate value from commissioning documents. Method 2 uses module area and efficiency, physical and datasheet values. If both agree, the capacity, area, and efficiency inputs are mutually consistent with the reported energy; if they diverge beyond 25%, at least one input is inconsistent and no result is returned.

Cross-validation.

DifferenceResult
≤ 25%Both values averaged and reported as H_POA
> 25%Rejected — "Error. Please verify your inputs."

Worked example

E_AC = 48,000 kWh   P_DC = 1,000 kWp   A = 5,000 m²
η_module = 19%      PR = 80%          G_STC = 1 kW/m² (fixed)

Method 1: H_POA_capacity = (48,000 / 1,000) × (1 / 0.80)
                         = 48 × 1.25 = 60.00 kWh/m²

Method 2: H_POA_area     = 48,000 / (5,000 × 0.19 × 0.80)
                         = 48,000 / 760 = 63.16 kWh/m²

Difference = |63.16 − 60.00| / 63.16 × 100 = 5.0%  → within tolerance

Result: H_POA = (60.00 + 63.16) / 2 = 61.58 kWh/m²
        Insolation POA = 61.58 kWh/m²

Convention and caveats.

Documentation in progress

The following calculators are live but their full methodologies are not yet published. No formula is documented here until it is verified.

Standards and technical references

StandardTitle / scopeRelevance here
IEC 61724-1:2021PV system performance — Part 1: MonitoringPrimary reference for all yield, PR, and loss metrics
IEC 61724-2:2016Part 2: Capacity evaluation methodCapacity-based PR methodology
IEC 61724-3:2016Part 3: Energy evaluation methodEnergy-based performance evaluation
IEC 61215-1:2021Module design qualification and type approvalSTC definition, NOCT procedure, degradation characterisation
IEC 61683:1999Power conditioners — efficiency measurement procedureInverter efficiency principle; basis for weighted-efficiency definitions
IEC 61730PV module safety qualificationOperating-limit reference for module efficiency validation
IEC 62446-1Testing, documentation and maintenance of grid-connected PVString current verification basis
IEC/TS 63019:2019PV power systems — Availability: terms, definitions and measurementAvailability terminology and reporting framework (Plant & Grid Availability, §15)

Additional references:

On IEC application: IEC 61724-1:2021 defines P_o as DC nameplate capacity. Where a Kindastuff calculator accepts AC capacity (CUF/PLF), that extension is documented in the relevant section above. The formula structure stays consistent with the standard; only the capacity reference changes to match contractual requirements.

Variable reference

SymbolMeaningUnitIEC 61724-1 ref.
E_ACNet AC energy outputkWh§4.3
P_refCapacity reference (DC or AC)kWp / kW§3 (adapted)
P_DCDC nameplate capacity at STCkWp§3 (P_o)
T / NPeriod hours / daysh / days—
H_POAPlane-of-array insolationkWh/m²§4.1 (H_i)
G_POAInstantaneous POA irradianceW/m²§4.1 (G_i)
G_STCSTC irradiance (fixed)1 kW/m² = 1000 W/m²constant
Y_fFinal / Specific YieldkWh/kWp§7.3
Y_rReference Yieldh§7.1
PR / PR_tcPerformance Ratio (base / temp-corrected)—§7.5 / Annex B
γModule power temperature coefficient%/°Cdatasheet
T_module / T_cellModule surface / cell temperature°C—
A_totalTotal active module aream²—
η_module / η_STCRated / STC module efficiency%IEC 61215-1
η_op / η_tcOperating / temp-corrected efficiency%—
SRSoiling ratio——
DaAnnual degradation rate (uniform across all years)%IEC 61215 / datasheet
nYears since commissioningyears—
SFInsolation scaling factor——
PTI / PR_expectedPerformance Target Index / anticipated PR— / %Not IEC
η (inverter)DC-to-AC conversion efficiency%IEC 61683
σ / CVStd deviation / coefficient of variation% / %—
MAD / MMedian abs. deviation / Modified Z-Score—Iglewicz & Hoaglin
NOCTNominal Operating Cell Temperature°CIEC 61215-1
U0 / U1Faiman heat-loss coefficients (29.0 / 6.9)W/m²K; W/m²K/(m/s)—
φ / BGBifaciality factor / bifacial gain— / %—
Module PRModule health index (module-level, not IEC plant PR)%Not IEC

Scope, assumptions, and limitations

Version history

VersionDateChange
1.0October 2026Initial publication: 13 calculators fully documented; 4 marked in progress.
1.1October 2026Solar Insolation — POA Back-Calculator documented (§17); count restated as 17 metrics across 15 calculators — 14 documented, 3 in progress. §2 Corrected CUF aligned to a single uniform annual degradation rate, and the standards list extended with IEC/TS 63019:2019.

Report an error or suggest a correction

Calculation errors are treated as high priority. If you believe a formula deviates from a referenced standard, open an issue with the specific section, your inputs, the expected result, and the observed result.

Open an issue on GitHub →

Do not post confidential plant data. Issues are public. Use anonymised or synthetic values.

Full methodology document

The versioned, detailed companion to this page — including full validation rules, worked examples, and change history — lives in the public repository:

Read METHODOLOGY.md on GitHub →